找诗词>英语词典>tie beam翻译和用法

tie beam

英 [taɪ biːm]

美 [taɪ biːm]

网络  系梁

化学

英英释义

noun

  • a horizontal beam used to prevent two other structural members from spreading apart or separating
    1. he nailed the rafters together with a tie beam
    Synonym:tie

双语例句

  • Integrated Construction Technology of Rigid Tie Beam of Long Span Through Steel Tube Arch Bridge
    大跨度下承式钢管混凝土拱桥刚性系梁综合施工技术
  • This paper analyses some problems that should be paid attention to during the construction of anti-seismic structure, suct as mechanical properties of reinforcement 、 substitution of reinforcement 、 binding of column tie and anchorage of beam reinforcement at frame joint 、 tied reinforcement splice joint.
    本文分析了抗震结构钢筋工程施工中,钢材材质、钢筋代换、框架节点处柱箍的绑扎及梁纵筋的锚固、钢筋接头设置等方面应注意的问题。
  • For the features of force on the full steel heterotypical arch bridge, an easy and appropriate method is proposed for installation of the hanger rod by jacking the tie beam.
    针对全钢异型拱桥的受力特点,提出一种简单适用的顶系梁安装吊杆的施工方法。
  • He nailed the rafters together with a tie beam.
    这儿需要加两根系梁。
  • The installment of tie beam of pier in high earthquake intensity regions was studied in the view of improving seismic performance of bridges.
    从提高桥梁抗震性能的角度出发,研究了高烈度区桥墩系梁的设置问题。
  • OSDTS not only has good wholeness, big stiffness, but also decreases the whole deformation of bridge and improves the mechanical behavior of deck with the bottom chord and tie beam heightened. 2.
    该方案整体性好、刚度大,由于下弦杆和系梁加高,不仅桥梁的整体变形减小,而且也改善了桥面系的受力状态。
  • When s>the space effect of the portal frame is also poor with a tie beam acting as a tie bar. The rational range of the distance between two rows is 4d~ 8d.
    s>8d时,门架空间效应也差,联系梁起拉杆作用,前后排桩距的合理范围为4d~8d。
  • Tie beam is an important element in frame-shear wall structure.
    连梁在框架-剪力墙结构中,也是很重要的一个构件。
  • To sensible regulation the suspender tension, the tie beam control parts and the internal force of the arch rib will be distributed rationally.
    通过对吊杆的张拉力进行合理调整,使得系梁控制部位及拱肋的内力分布趋于合理。
  • Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection. slipping of upper femoral epiphysis
    肉眼观察表明:在端节点处的系梁和横梁上翼缘之间产生一种沿桥梁纵向的水平位移。股骨上端骨骺滑脱移位